Australia: Adbri subsidiary Cockburn Cement has approved a US$152m upgrade to its Kwinana grinding plant in Western Australia that includes a slag feed system. It says the investment will consolidate the cement operations at its Kwinana site. At present clinker is transported by truck from the Kwinana Bulk Terminal to cement mills at both the Kwinana grinding plant and the company’s integrated plant at Munster. It will increase its production capacity to 1.5Mt/yr from 1.1Mt/yr at present. The project is expected to save the company US$15m/yr due to better energy, transport and maintenance efficiency when the plant is commissioned by mid-2023. The producer will fund the investment through existing debt facilities.
The upgrade project includes: a bulk materials conveyor linking the Kwinana Bulk Terminal (KBT) facility to a new 110,000t clinker storage shed, incorporating an automated reclaim system, to eliminate road transport and minimise clinker handling using mobile equipment; a slag feed system that will handle granulated blast furnace slag and additives such as gypsum and limestone; a ball mill circuit with the installation of two new cement mills capable of grinding slag and clinker; and a new 21,000t finished product storage, truck loading and weighbridge infrastructure for storage and despatch.