China: Hebei Zongheng Group Tangshan Fengnan Iron & Steel has ordered Inba slag granulation and dewatering equipment as part of a new 12Mt/yr iron plant. Capital Engineering & Research Incorporation (CERI), the general contractor, has signed two contracts with Paul Wurth for engineering and supply of four sets of Central Feed Bell Less Top charging systems as well as slag-related equipment for the four blast furnaces at the new plant. The Inba order covers eight dewatering drum units under hot water system, which is quite commonly adopted by local customers.
All four blast furnaces of Tangshan Fengnan’s new plant are scheduled to be commissioned in 2018. A fifth blast furnace may be built after the hot commissioning of the first four furnaces.